
Installation: Stage 2
Page 6 of 24 // email
[email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
UBLS - Under Bed Lift Swivel
Removing the Panels & Uprights
Make sure mechanism is in the full OUT position.
First remove the screen uprights by removing X4
locking bolts on the mount toggles so they can be
un-hooked as shown.
Remove the top access panel by removing the X4
bolts shown.
Screen uprights
Top access
panel
Kommentare zu diesen Handbüchern