
Installation: Stage 5
Page 9 of 20 // email
[email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PH2 - Projector Hinge
5 [0.2]
5 [0.2]
Securing The Moving Panel
Close the mechanism and
place sticky pads on the
under tray as shown. Offer
the moving panel into place
with a 5mm equal gap all
round. Push against sticky
pads to secure in place.
Under Tray
Front Panel
Moving Panel
Sticky Pad
MAKE SURE MOVING PANEL HAS AN EQUAL
5mm [0.2”] GAP ALL THE WAY ROUND
Kommentare zu diesen Handbüchern