
Installation: Stage 3
Page 6 of 14 // email
[email protected] tel: +44 (0) 1438 833577 fax: +44 (0) 1438 833565
PDM1, 2 & Custom - Projector Drop Mechanism
Final checks
- Check the mechanism is working correctly
- Make sure the unit is fully out as shown
- Make sure the projector is secure using the range of nuts, bolts and washers provided
- Slide the mounting plate back into the unit and the slide toggles into the key holes x6
- Attach the bottom plate back to the unit using M5 countersunk bolts
Locking nut
MAKE SURE THE BOTTOM
PLATE AND LOCKING PLATE
ARE SAFE AND SECURE
Mounting
Kommentare zu diesen Handbüchern