Future-automation MLS Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Hissen Future-automation MLS herunter. Future Automation MLS User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 19
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
ISSUE: 011
www.futureautomation.co.uk
FUTURE
AUTOMATION
MLS
Marine Lift Swivel Mechanism
Installation Instructions
Seitenansicht 0
1 2 3 4 5 6 ... 18 19

Inhaltsverzeichnis

Seite 1 - AUTOMATION

ISSUE: 011www.futureautomation.co.ukFUTUREAUTOMATIONMLS Marine Lift Swivel MechanismInstallation Instructions

Seite 2

VESA 200 MountRemove the screen plate,hightlighted above, and fixit to the back of the screenusing the appropriatefixings.Stage 8Checking the screen m

Seite 3

Before mounting any screen, press STOP on the IRremote in order to prevent any motor movementsduring the mounting procedure.Make sure the swivel is in

Seite 4

The IR sensor can be located anywhere outside of the cabinet. Stage 10Fix the IR sensor and run the mechanismSheet 11 of 18ISSUE: 011www.futureautom

Seite 5

Viewing from the frontHOMEPOSITIONCLOSEDPOSITIONPRESSPRESSREMOTECONTROLSIN - Takes the screen inside the cabinetOUT - Takes the screen out of

Seite 6

30°To store theposition inthe memoryPOSITION OPTIONSProgramming new memorised positionsOUT< or >To rotate thescreen left orrightPRESSSTORE +PRES

Seite 7

It is VERY important that when all of theelectrical connections are made, theconnector blocks are connected in theway shown above, with all the wires

Seite 8

18pinsOnce the mechanism is moving, any contact closure input will cause the lift to stop. There will then be a short delay before another command can

Seite 9

912345678PIN 1: INPIN 6: OUTPIN 3&4: GROUNDPIN 2: INPIN 3: OUTPIN 5: GROUNDpins61Sheet 16 of 18ISSUE: 011www.futureautomation.co.ukFUTUREAU

Seite 10

Operation DetailsEMERGENCY STOPThis connection will stop all functions of the mechanism once broken / removed.DC1A low voltage connection for the swit

Seite 11

M6 x 25mmPointed x 8The fixings immediately below are the standard ML-S fixings supplied with every ML-S product.There will be one other pack of

Seite 12

Your Pack Should Contain1 ML - SMarine Lift Mechanism1 Standard MLFixtures PackThe contents ofwhich can be found on Sheet 181 Fixtures PackRelating to

Seite 13

Stage 1Check the operation of the mechanismCONTROLSIN - HIDE SCREENOUT - REVEAL SCREEN FACING FORWARDSTOP - STOPPRESET - MEMORYSTORE + PRESE

Seite 14

AVIEWING SIDEAluminiumFlapDETAIL A SCALE 1 : 5Take care when fixing the surfaces together. Place the objects on a flat surface to make sure the edges

Seite 15

BDETAIL BStage 3Fixing the lift in the cabinetPlace the mechanism within the cabinet. Raise the beam to the top and guide base through the opening in

Seite 16

CDETAIL C SCALE 1 : 1.5Stage 4Adjusting the base panel heightBy adjusting the white screwup or down, you can adjustthe stop height of thelifting beam

Seite 17

DDETAIL D SCALE 1 : 4Once the base panel hasbeen positioned correctlyand properly secured, itis then possible to re-attachthe mounting frame.Firstly m

Seite 18

Stage 6Adjusting the flap-up positionCABINET TOP - SIDE VIEWBy adjusting the white screw,at each side of the lift, you canadjust the tilt of the flap.

Seite 19

Stage 7Adjusting the flap-down positionBy adjusting the bolts under each flap arm, it ispossible to alter the angle the flap opens to. It isvery impo

Kommentare zu diesen Handbüchern

Keine Kommentare